UK at “critical juncture” in maximising green hydrogen potential

RenewableUK has urged the government to work closely with the green hydrogen industry to bring forward new policies that mean the pace at which major projects are built can be accelerated.

In Surveying the UK’s Green Hydrogen Supply Chain Capability, RenewableUK warned that the UK now finds itself at a critical juncture, where other countries are taking steps to overtake it in the global green hydrogen race. Despite being home to the likes of ITM Power and Ceres, who have had their technologies licensed worldwide, and hosting an electrolyser pipeline of 1.5GW, the UK risks being left behind due to ambitious tax incentives and subsidies being offered overseas – not least the Inflation Reduction Act in the US. It means that now is the time to mount a response.

Part of this should be building multiple large-scale projects as soon as possible, with this something that would go a long way to validating the UK as a viable market, while also providing predictable use of local supply chains. To do this, the government needs to speed up the roll out of schemes such as the Hydrogen Business Model and Net Zero Hydrogen Fund, while offering greater clarity on, and streamlining of, future funding allocation rounds to 2030.

It should also consult and then explore the potential for a working group with industry, one that would establish how tax incentives and the use of institutions, such as the UK Infrastructure Bank, could make the UK more competitive internationally for the green hydrogen supply chain.

It went on to make further recommendations around different themes, including plugging the skills gap, where it suggested building on the North Sea Transition Deal with more investment in dedicated reskilling programs for people with oil and gas and further funding into education and training, especially for electrochemistry, and around how to go about preparing the UK’s infrastructure for green hydrogen.

With 3.4TWh of large-scale hydrogen storage set to be needed by 2030, and transport infrastructure required alongside this, RenewableUK called for the 2025 date for the transport and storage business model support to be brought forward and for engagement in bilateral agreements to construct strategically positioned infrastructure in the interim. Future export prospects for international hydrogen trade should be reviewed, with investment made to build those pipelines ahead of time.

The UK should also look to make the most of its offshore wind resource, which is set to be crucial in helping to cut the cost of green hydrogen production, with green hydrogen projects offering very promising opportunities for co-location, paving the way for important system balancing services.

Therefore, a detailed study should be carried out into the policy and regulatory changes that are required to incentivise the interface between offshore wind and green hydrogen; efforts should be made to build on the success and experience of the UK’s industrial clusters by consulting on creating hubs targeted at green hydrogen; and National Grid ESO’s Connections Reform should look to reward technologies that provide system flexibility and stability services, which would include co-located electrolytic hydrogen. At present, the process only looks at capacity, not utilisation. This should be reformed, allowing electrolysers to provide grid services, with any institutional barriers then communicated to industry.

Share the Post: